Skip to content
Welcome to Zhejiang Yiming Health Technologyfabio@yimingair.com+86 18167383138
Start a project ↗

Project confidentiality

IP and Confidentiality

A project reference for drawings, samples, specifications, branding and other customer-provided information.

Customer information

Drawings, samples, specifications, packaging files and branding materials are treated as project information for the agreed development and production scope.

Project controls

Access, revisions, approvals and required returns or destruction are discussed according to the project terms.

Confidential development

Customers can share confidentiality requirements before proprietary materials are reviewed.

Ownership and use

Ownership, permitted use and manufacturing responsibilities are confirmed in the applicable commercial or project documentation.

Protected project information

Project information may include drawings, CAD files, samples, measurements, material selections, valve layouts, tooling details, packaging artwork, brand assets and commercial specifications.

Controlled use

Project information should be used for the agreed development, quotation, sampling, production and order-support scope.

Revision and access

Approved revisions should be identifiable so that outdated drawings or specifications are not used for production.

Confidentiality requirements

Customers can provide confidentiality, access, return or destruction requirements before proprietary information is shared for review.

Need-to-Know Access and Sample Control

Confidentiality depends on limiting access, not only on signing an agreement. Drawings, specifications and costing files are stored in project folders that are available to the commercial owner, engineering, quality and the specific production staff involved. Samples and prototypes carry a project reference and are kept apart from stock so they are not used for another order. Visitors do not have access to customer tooling or sample areas without approval. When a colleague leaves a project, access is removed and any printed material is returned or destroyed. These controls apply equally to customer-branded packaging artwork and to technical files received through WhatsApp or another messaging service.

Tooling, Subcontracting and Project Close-Out

Customer tooling, moulds and fixtures are assets with a defined project purpose. We record what was made, where it is stored and who is authorised to use it. If a subcontractor needs a drawing or sample, we share only the minimum required, confirm the confidentiality terms and keep a record of the transfer. At the end of a project, we follow the customer's instructions for returning or retaining samples, files and tooling, taking account of warranty and legal recordkeeping needs. Any suspected loss, unauthorised copy or misuse is escalated immediately so that access can be contained and the customer informed. This close-out discipline is part of our ISO 9001 document control process.

Discuss the requirements for your project.

Share your product, destination market and document requirements so the applicable scope can be confirmed.

Discuss your requirements ↗

Read the Project IP and Confidentiality Policy