Sample timing & fees
For projects other than Air Wedge Bags, sample development is generally 10–14 working days with clear drawings and requirements, or 20–25 working days from an initial idea. See the sampling timelines for the Air Wedge Bag conditions.
Lead time starts once drawings and requirements are confirmed and the sample fee is received. Shipping time is excluded. Sample fees are quoted according to the product and development requirements.
Sample fees can be credited against subsequent bulk orders once the cumulative bulk order value reaches US$5,000. Orders may be accumulated towards this threshold, and the arrangement remains valid long term.
Explore sampling & fees →Design protection & ownership
An NDA can be agreed before detailed project information is shared. A dedicated agreement defines confidentiality, ownership, exclusive production and permission to display project materials.
Customer-provided designs remain the customer’s. Project-specific jointly developed drawings and agreed deliverables belong to the customer under the dedicated agreement. Existing technology, standard components and third-party rights are identified separately.
Customer-exclusive designs are not manufactured for third parties or publicly displayed without the customer’s written authorization.
Review design protection →Branding & packaging scope
Provide logo artwork, colour references, placement requirements and any label, instruction or packaging files. Review the proposed artwork and packing configuration before approval.
The quotation should identify included components, artwork or setup work, individual packing, carton contents and shipping marks. Covers, pumps and retail packaging should be listed explicitly where required.
Confirm who supplies each file or component and who approves the final version before production.
From approval to repeat orders
For repeat orders, identify the approved sample and document versions. Reconfirm material and component availability, artwork, packaging and any requested changes before confirming the quotation and schedule.
Review proposed substitutions or specification changes before proceeding. A previous approval remains useful only when the new order refers to the same agreed configuration.
Keep one current revision list and confirm the reference documents for each order.